Pictures from the Toothpick Bridges

PHS Physics Students

 There it goes!

Each bridge is connected to a bucket full of sand or water to apply the force to break the bridge.

 This is the standard testing set up. It is very simple compared to the machines that may be purchased to crush the bridges. It is also pretty effective.

 Preparing to test the strength of this design of the bridge.

 Another design trial.

 Each bridge is checked for the mass and length standards. Part of the criteria for the design is meeting the standards for bridge mass, length and width of the bridge.

 As you can see, we have a variety of bridges that the students try. Each design is creative in its own way.


 

Back to The Toothpick Bridge Project

 

Sponsor Name Peoria High School
Developer Name David Wm. Hill
Date LastUpdated January 1, 2001